SustainabilityGreen ValueGreen Projects
Our Board and our campaign staff are ecstatic with the design layout and very pleased with the end results. [Kinsley’s people] are very understanding and go out of their way to be accommodating.

Robert L. Simpson
Executive Director of Crispus Attucks Association Inc.
  GREEN VALUE

The experienced Kinsley team will:

  • Participate in the integrated design process during the preconstruction phase, bringing alignment between the designers and constructors and creating a responsibility matrix.
  • Advise the preconstruction team on two of the most important factors during the design phase – energy system optimization and sustainability in the following categories:

    • Sustainability of the site improvements
    • Water efficiency
    • Energy optimization of all mechanical and electrical systems
    • Sustainable materials selections
    • Indoor Air Quality
    • Innovation and design process

  • Prepare the sustainable construction cost estimate with value added alternatives for Green materials and sustainable energy efficient systems. (Refer to Graph).